FSO / FPU / FPSO / FGSO

Moho Nord TLP

Moho Nord TLP

Client : TOTAL

Dates : 2013-2015

Presentation :

- Republic of the Congo (Congo-Brazzaville)

- Distance from shore: 80km

- Distance from Moho-Bilondo FPU: 20-30 km

- Distance from Nkossa field: 25 km

- Water Depth from 750 to 1200 m (TLP: 780 m)

DVO Services :

- In charge of the mooring system for Moho Nord TLP

- Engineering, detailed phase and execution phase up to delivery

- Procurement activities of the mooring system components

MOHO BILONDO

MOHO BILONDO

Client : TOTAL and DORIS

Dates : 2005 - 2007

Presentation :

- Republic of the Congo (Congo-Brazzaville)

- 80 km offshore

- Water Depth from 540 to 740 m

- Services for 2 oil fields: “Moho upsides” and “Bilondo”

- 7 production wells

- Production 90 000 bbls / day

DVO Services :

- Supervision of technical comparison between FPU or FPSO options for Moho Bilondo fields development scheme

- Definition of installation principles

- Visit of tanker: evaluation of the ship’s adequacy as an FPU candidate

- Interface coordination

- Onsite installation supervision for the onshore pulling of the pipeline

AKPO

AKPO

Client : TOTAL, SAIPEM and DORIS

Dates : 2003-2006

Presentation :

- Nigeria

- Water depth: from 1250 to 1480 m

- Dimensions: 310 m x 60 m x 31 m

- Storage capacity: 2 million bbls

- 12 mooring lines, each 2400 m long

- Estimated production: 1 billion bbls of oil and 4 trillion cubic feet of natural gas

DVO Services :

- Conceptual definition of the marine and offloading functions for the FPSO and the buoy

- FPSO Mooring analysis (including tandem offloading operations)

- Assistance for the FPSO operation (marine wise):

  o Review of the PID / PFD, HAZID, HAZOP

  o Definition of the nautical needs for exploitation of the site, including inspection, maintenance and repairs of the underwater equipments

  o Market survey for IMR vessels

  o Preparation of the contracts for the operations (ships, catering, people on board the FPSO…)- Marine operations engineer

DALIA

DALIA

Client : TOTAL and TECHNIP

Dates : 2003-2006

Presentation :

- 135 km offshore Angola

- Water depth: from 1200 to 1500 m

- 67 wells drilled – 8 flexible risers

- 300 m x 60 m x 32 m

- Storage capacity: 2 million bbls

- Expected maximum production: 240 000 bbls / day

- Spread moored

DVO Services :

- Hull  interface definition in contractor project team

- Preparation and supervision of marine operation for the installation of subsea risers and bundles

- Preparation and supervision of FPSO tow from Korea to Dalia field

- Organisation, marine wise, of FPSO call in Cape Town

- Feasibility study of supply chain for polymer injection project

GIRASSOL

GIRASSOL

Client : TOTAL

Dates : 1997-2003

Presentation :

- Angola

- Water depth of 1350 m

- Storage capacity: 2 million bbls

- New built hull, 300m x 60m x 31m

- 16-leg spread mooring

- Maximum oil production: 200.000 bbls / day

- Export on loading buoy (SPM, semi taut mooring) or in tandem

- Network of bundles

- Riser tower & flexible jumpers

DVO Services :

- Conceptual definition of hull including interface definition with topsides

- CFT Technical specifications for the hull and the export buoy

- Interface manager in Company project team

- Company installation manager for the riser tower and the subsea bundles

- Supervision on FPSO mooring installation

- Technical investigation and implementation of action plan following loading buoy anchoring leg failure.

AMENAM

Client : TOTAL

Dates : 1997-2003

Presentation :

- Nigeria

- Water depth of 1350 m

- 2.4 million bbls of storage capacity

- New built hull, 300m x 62m x 32m

- Quarters for 130 people

- External turret mooring

- Export in tandem or CALM buoy

DVO Services :

- Feasibility studies

- Engineering follow up for hull

USAN

USAN

Client: TOTAL

Dates: 2009-2010